AV integrator checklist: turn a display enquiry into a project brief
Build a clear display project brief covering room requirements, model revisions, accessories, site preparation and acceptance tests.

An AV integrator’s display enquiry is easier to price when the supplier can separate the equipment package from installation, software and destination requirements. A screen-size request is a starting point. A useful project brief identifies the end-user workflow, the exact delivery scope and the evidence required at handover.
Freeze the room requirements first
Collect the room plan, seating distance, lighting, intended activities and available infrastructure. For a multi-room project, identify genuine room types rather than assuming every location is identical. Ask the customer to approve the operating workflow before choosing a repeated package. Include any meeting platform, accessibility or local compliance requirements for separate confirmation.
Keep the equipment list model-specific
Record the exact model and hardware revision, operating system, touch specification and included accessories. Mark optional items separately: OPS computer, licensed software, wireless presentation, camera, stand and wall mount. A catalogue may describe multiple series; do not merge features into a single assumed specification. Request a written confirmation for substitutions.
Separate supply from site work
List who provides mounting hardware, installation, power, network and cable routing. Check site access and the route from unloading point to the room. Confirm packing and delivery responsibilities as part of the quotation, including destination city or port. Avoid treating a product brochure as a complete local installation or compliance assessment.
Agree evidence for acceptance
Use a test sheet covering the required inputs, touch workflow, playback and any conferencing equipment. Include accessory checks, serial-number records and a handover package. Ask the buyer to confirm what constitutes acceptance before shipment or installation. Price, MOQ, lead time and warranty arrangements should follow the agreed project scope and written quotation.
Planning example
Planning example, not a customer case: an integrator preparing a mixed classroom and meeting-room order can create two approved room packages instead of applying one accessory list to every room.
Buyer checklist
- Approved room types and workflows
- Exact models, revisions and optional equipment
- Installation versus supply responsibilities
- Destination and local requirements to confirm
- Acceptance sheet and handover documents
Common buyer questions
Can a reference specification replace the final quotation?
No. Use it to frame questions, then confirm current configuration, included items and commercial terms in writing.
What should change if a model is substituted?
Review compatibility, mounts, accessories, operating system and acceptance tests before approving the revised equipment list.
Copyable project brief
Complete these fields before requesting a project quotation.
Project / location: Room plan and user workflow: Screen size / quantity: Computer, software and accessories: Installation and delivery responsibilities: Acceptance tests and required date:
JIADA product information → · Buyer guide PDF ↓
AI-assisted editorial guide from JIADA. Planning examples are hypothetical, not customer case studies. Product configurations and commercial terms are confirmed in the written project quotation.
Project questions
Orion Yang · sales@jiadatv.com



